PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation for the underground roughing at Sprinkler room (152A) Facing South-East (800x600).jpg Finished installing metal decking at partial Derrick -3 (2nd Floor) Facing West (800x600).jpg Installing rebar columns at Elev. 5,6 (3rd Floor) Facing South-East (800x600).jpg Building rebar mats for Elev. 5,6 (3rd Floor) Facing  North (800x600).jpg Compacted and backfilled inside Stair -5 pit Facing West (800x600).jpg Finished installing temporary power to the electrical panel Facing South (800x600).jpg Material, rebar, and shear wall forms (3rd Floor) Facing West (800x600).jpg Tying the rebar mats at Stair -2-Elev. 4 (3rd Floor) Facing South-West (800x600).jpg Underground sanitary sewer roughing at Sprinkler room (152A) Facing South (800x600).jpg
Previous pageNext page Compacted and backfilled inside Stair -5 pit Facing West (800x600)
Compacted and backfilled inside Stair -5 pit Facing West (800x600)